Completed steel bridge grid deck installed on a highway structure

MLK Roadway and Sidewalk Rehabilitation

OhioHalf-Filled Roadway + Fully Filled SidewalkYear on file
Project Summary

MCS supplied two different grid deck systems for the same Ohio structure: a half-filled roadway deck and a fully filled sidewalk deck. The sidewalk scope was larger than the roadway scope, and MCS also provided field-installed materials including three custom beveled shim-plate configurations.

Upward view of a bridge's structural steel framing and grid decking from below
Existing bridge conditions before rehabilitation
Step 01

The Challenge

Beyond manufacturing the roadway and sidewalk panels, MCS was responsible for several field-installed components. The most difficult items were three styles of beveled shim plates that MCS does not typically produce. The plates started at ⅜ inch thick and had to be beveled to 5⁄16 inch. Finding a supplier with the right capability and schedule proved difficult and created a risk to field delivery.

Interior of the MCS fabrication facility with overhead cranes and steel work stations
Grid panel fabrication in the MCS shop
Step 02

The MCS Approach

MCS coordinated production of both grid systems and the associated field materials as one comprehensive package. When an outside source for the beveled shim plates could not be secured in time, MCS’s Alum Bank operation completed the beveling in-house. Although the plates required additional processing time, they arrived at the jobsite when needed and did not interfere with fabrication of the main deck panels.

Stacks of galvanized steel bridge grid deck panels staged outdoors for shipment
Finished grid panels staged for delivery
Step 03

The Outcome

The sidewalk portion was completed on budget, while the roadway portion finished slightly over budget. The two deliveries occurred approximately three and four days after their respective target dates. About one year after installation, no performance issues had been reported. Customer survey feedback rated MCS 'Outstanding' in customer service, product quality, communication, and on-time delivery, with the majority of evaluated categories receiving the highest rating.

Completed steel bridge grid deck installed on a highway structure
Related Projects

More Half-Filled Roadway + Fully Filled Sidewalk work.

Discuss a Similar Project

Have a bridge or industrial grid project in mind?

Tell us what you're working on. The MCS Bridge team can review drawings, answer engineering questions, provide a quote, or help you evaluate the right grid system for your application.

Engineering review and system selection
Detailed quoting and procurement support
Fabrication planning and delivery coordination